HERZ

HERZ in Wieliczka

Extending the production hall HERZ Sanitary and Heating Fixture. Building a storage hall, rebuilding a heat distribution center, building underground storage reservoirs, making a 4 meter high retaining wall with the length of 150 linear meters.

Object specification:

  • Production-storage area 4,500 m2
  • Paint workshop area 500 m2
  • Communication system 2,500 m2
  • Direct foundation on natural soil.
  • The whole structure of the hall is made from steel.
  • Hall lining from layered plates.